Bridges

Project 1

Durgam Cheruvu Cable-Stayed Bridge, Hyderabad

Scope: Structural strengthening and bearing system integration for Hyderabad’s first extradosed cable-stayed bridge.

Key Highlights:

    1. Spans 435 meters with a 233.8-meter main span.

    2. Constructed using 6,600 m³ of concrete and 4,800 tonnes of steel.

    3. Features dynamic LED lighting with 25 color themes.

    4. Reduces travel time between Jubilee Hills and Madhapur from 30 to 10 minutes.

Project 2

VUDA NAD Junction Flyover, Visakhapatnam

Scope: Execution of a three-level grade separator to alleviate congestion at NAD Junction.

Key Highlights:

    1. Includes a six-lane underpass and two elevated flyovers.

    2. Designed to handle approximately 10,000 Passenger Car Units (PCUs).

    3. Enhances connectivity to the city airport and surrounding regions.

Project 3

Vizag Port Flyover

Scope: Construction of a 3.3 km flyover to streamline cargo movement to Visakhapatnam Port.

Key Highlights:

    1. Eliminates 11 level crossings, facilitating uninterrupted traffic flow.

    2. Features carriageways of 7 meters (two lanes) and 10.5 meters (three lanes).

    3. Joint venture between Visakhapatnam Port Authority and Rail Vikas Nigam Ltd.

Project 4

Kazipet Railway Bridge Strengthening

Scope: Structural reinforcement and bearing replacement for a critical railway bridge in Kazipet.

Key Highlights:

    1. Enhanced load-bearing capacity to support increased rail traffic.

    2. Implemented advanced materials to ensure longevity and durability.

Project 5

Assolna Bridge Rehabilitation, Goa

Scope: Comprehensive rehabilitation of the Assolna Bridge to restore structural integrity.

Key Highlights:

    1. Addressed corrosion issues and reinforced structural components.

    2. Improved safety and extended the bridge’s service life.

Project 6

BPPTL Bearing Replacement Work

Scope: Replacement of elastomeric bearings to restore bridge articulation and load distribution.

Key Highlights:

    1. Utilized IS/IRC-compliant bearings for enhanced performance.

    2. Minimized traffic disruption through efficient project execution.

Project 7

SRTL R&R Work

Scope: Repair and rehabilitation of structural components for SRTL infrastructure.

Key Highlights:

    1. Implemented advanced repair techniques to address structural deficiencies.

    2. Ensured compliance with safety and quality standards.

Project 8

SGTL Anti-Carbonation Painting Work

Scope: Application of anti-carbonation coatings to protect concrete surfaces from environmental degradation.

Key Highlights:

    1. Extended the lifespan of structures by preventing carbonation-induced corrosion.

    2. Enhanced aesthetic appeal with durable finishes.

Project 9

Bellampalli Site Works

Scope: Execution of structural repairs and maintenance activities at the Bellampalli site.

Key Highlights:

    1. Addressed structural wear and tear to ensure operational safety.

    2. Implemented preventive measures to mitigate future deterioration.

Project 10

Balkatti Bridge Project

Scope: Construction and commissioning of the Balkatti Bridge to improve regional connectivity.

Key Highlights:

    1. Designed to accommodate increased vehicular traffic.

    2. Incorporated modern engineering practices for structural resilience.