Scope: Comprehensive retrofitting and modernization of the 150-year-old Prakasam Barrage to enhance flood resilience and water management capabilities.
Key Highlights:
Replacement of 70 crust gates and seour vents to improve silt removal efficiency.
Installation of sheet pile cut-offs upstream and downstream to prevent seepage and enhance structural stability.






Scope: Structural rehabilitation and preservation of the historic Miralam Tank to restore its functionality and heritage value.
Key Highlights:
Repair of masonry structures and sealing of leakages to prevent water loss.
Desiltation and cleaning to improve water quality and storage capacity.
Scope: Execution of grouting operations at the Kinnersani Dam to address seepage issues and reinforce the dam structure.
Key Highlights:
Identification and sealing of voids and cracks within the dam body using pressure grouting techniques.
Strengthening of the foundation to enhance the dam’s stability and lifespan.